Foundations, driveways and sitework for large lots on canyon slopes and along the water. DB Concrete has spent 25+ years on the kind of big, steep sites Rob Roy is made of.
Rob Roy sits between Loop 360 and Bee Cave Road. It took shape in the early 1980s, and the first homes went up around 1979 and 1980. By 2005, Travis County counted 296 lots. Rob Roy West came later, starting around 2008.
Most lots run from one to five acres. Some sections drop into canyons. Others sit on Lake Austin or on wooded lots along Barton Creek. Large homes on large lots mean big slabs, long driveways, and a lot of grading.
Every section of Rob Roy is a little different. These are the things we plan for here.
The Rob Roy Homeowners Association built the entrance gates and keeps them up. In 2005 the county agreed the streets could become private. You reach Rob Roy from Loop 360 at Pascal Lane or Wild Basin Road South.
For a concrete job, access is part of the plan. We set gate times with you before pour day. We plan where the mixer and pump will stand. A foundation pour can't wait at a closed gate.
Rob Roy is in Travis County, and the city of Austin has planning and zoning say over some of its phases. Which rules apply can change from lot to lot. The HOA also has its own say.
We sort out who has a say on your lot before we price the job. Then we plan the foundation, the flatwork and the drainage so they meet it.
We walk the lot with you. We look at the slope, the trees, the access, and where the water goes.
You get an accurate takeoff and a written price. No guesswork and no surprise change orders.
We set gate access and truck routes ahead of time. We also work with your builder, your HOA and other trades.
We place and finish the concrete with care. Then we clean up and walk the job with you.
"James has always gone above and beyond on our projects. Fair pricing and communication is why I keep on using them."
"DB Concrete has been accurately installing our foundation designs for over 10 years. DB Concrete takes pride in their craft and it shows in their work. They always go that extra mile to make things 'right'."
"Precision starts before we ever step foot on the job site. Accurate takeoffs eliminate guesswork and help our clients budget confidently."
Yes. We come out, look at the lot, and give you a written price. You don't owe us anything to get it.
Yes. We set up gate access with you and the HOA ahead of time. We also plan where the mixer and pump will stand.
It depends on the lot. Rob Roy is in Travis County, and Austin has some say over some phases. We check yours before we give you a price.
That's normal here. We look at the slope on the first visit and plan the grading and drainage before the slab.
Tell us what you're building. We'll give you a detailed, dependable proposal, including what the slope and the gate will require.
Get a Free Quote Today